Projects Real Estate
City Hall Kampen
The township of Kampen set the goal to develop a sustainable and energy efficient town hall. The ambition of the township was to lower the EPG with 20%. Herman De Groot researched the possibilities and feasibility of the set goal.
The results of the research was that the building needed to be isolated structurally excellent and to apply energy efficient generation by the means of hot/cold storage in the ground in combination with a heating pump.
By administering this technology the EPG has decreased with at least 28%. To meet the demand for all facilities, ‘plug & play’ – concept per canvas of 1,80 meters, the choice has been made to place a climate ceiling that is completely acoustically closed. This choice makes it possible for modular walls to be moved or renewed without opening the ceilings. By administering this ceiling system an important reduction of the exploitation costs is realized.
Herman De Groot has designed all technology and the special ceiling and guided the realization of the City Hall.
Client
Gemeente Kampen te Kampen
Location
Kampen
Gross surface area
12.500 m²
Architect
Bd architectuur te Arnhem
ADDRESS
Nijverheidsweg-Noord 74a
3812 PM Amersfoort
CONTACT
T. 033 - 432 08 89
FOLLOW US
© 2016 HermanDeGroot Ingenieurs