Projects      Real Estate 

City Hall Kampen

The township of Kampen set the goal to develop a sustainable and energy efficient town hall. The ambition of the township was to lower the EPG with 20%. Herman De Groot researched the possibilities and feasibility of the set goal.

The results of the research was that the building needed to be isolated structurally excellent and to apply energy efficient generation by the means of hot/cold storage in the ground in combination with a heating pump.

By administering this technology the EPG has decreased with at least 28%. To meet the demand for all facilities, ‘plug & play’ – concept per canvas of 1,80 meters, the choice has been made to place a climate ceiling that is completely acoustically closed. This choice makes it possible for modular walls to be moved or renewed without opening the ceilings. By administering this ceiling system an important reduction of the exploitation costs is realized.

Herman De Groot has designed all technology and the special ceiling and guided the realization of the City Hall.

Client

Gemeente Kampen te Kampen

 

Location

Kampen

 

Gross surface area

12.500 m²

 

Architect

Bd architectuur te Arnhem

ADDRESS

Nijverheidsweg-Noord 74a

3812 PM Amersfoort

CONTACT

T. 033 - 432 08 89

E. Info@hermandegroot.nl

FOLLOW US

© 2016 HermanDeGroot Ingenieurs